From:                              route@monster.com

Sent:                               Thursday, April 07, 2016 11:50 AM

To:                                   hg@apeironinc.com

Subject:                          Please review this candidate for: p6 Scheduler

 

This resume has been forwarded to you at the request of Monster User xapeix03

Filomena Restituyo Lopez 

Last updated:  09/25/14

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


  
DO

Mobile: 18294554020   
filomena_rl@hotmail.com
Contact Preference:  Email

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Filomena Restituyo, Planner / Scheduler

Resume Value: ei4nc2mhpdu29rwc   

  

 

FILOMENA RESTITUYO LOPEZ

Dominican Republic

Phone:+1809 528 7490

E-mail: filomena_rl@hotmail.com

 

 

PLANNER / SCHEDULER

Dedicated in providing realistic scheduling/planning support by using industry driven practices and procedures.

 

 

 

PROFESSIONAL EXPERIENCE

 

ABEINSA EPC/ABENGOA - USA           April 2012 – Jun 2014

 

Planner/ Scheduler at Mojave Solar Plant (280 MW) – California (Oct 2013 – Jun 2014) 

 

Planner / Scheduler at the Solana Solar Plant (280 MW) – Arizona (Mar 2012 – Sep 2013)

·   Developed the Commissioning/Startup schedule program, to plan work and integrate project scope with the involvement of the Commissioning team.

·   Prepared baseline schedule to meet contract requirements.

·   Created tracking and monitoring forms

·   Maintained and analyzed project commodity curves in order to identify the strengths and weaknesses of work processes, and in turn provide new solutions to problems

·   Prepared and issued weekly and monthly reports to project stake holders.

·   Updated weekly schedule check for deviations, critical path accuracy, constrained dates, durations, logic, sequencing, scope of work.

·   Communicated critical schedule issues and concerns.

·   Assessed startup schedule with regard to the technical specifications of Contracts in order to ensure the schedules met their requirements.

·   Performed third-party schedule reviews and analysis, including the preparation of reports and layouts.

·   Maintained schedule files for each project revision in a timely and organized manner.

·   Lead regular Project team meetings to communicate schedule related issues between Engineering, Construction and Startup.

·   Lead field construction meetings to discuss construction progress, goals and constraints.

·   Established and maintained positive and effective working relationships with my team

 

 

ABENER ENERGIA/ABENGOA - Spain                      Mar 2008 – Mar 2012

 

Project Planner for the Solacor Solar Plant #1 and Solacor Solar Plant #2 (50 MW)

Mar 2010 – Feb 2012. Cordoba, Spain

Project Planner for the Solnova Solar Plant #3 (50 MW) Apr 2008 – Feb 2010 Seville, Spain

·   Developed the project plan, critical path and baselines (using Primavera Project Planner)

·   Designed project evolution graphs

·   Updated the planning schedules on a periodic basis

·   Developed and implemented required on-site programs

·   Integrated the subcontractor schedules with the main project schedule

·   Created reports informing the project directors of project progress, possible delays, potential problems, and alternative solutions that could develop throughout the project.

 

 

 

 

 

SAMPOL, INGENIERIA Y OBRAS Spain  Jun 2007 – Feb 2008

 

Industrial Technical Engineer

·   Implemented the Maintenance Management Software (AMOS Maintenance) used to monitor the Cogeneration Plant which supplied electrical, refrigeration, and thermal energy to Terminal 4 of the Barajas Airport in Madrid, Spain.

·   Provided technical assistance to the Engineering Department.

·   Tracked and monitored technical documentation.

 

 

EMPRESA GENERADORA DE ELECTRICIDAD ITABO, S.A.

Dominican Republic (Sep 1999 – Feb 2005).

 

For the Production Management Department:

Management and Monitoring of Incident Investigation Reports [Root Cause Analysis (RCA)] Responsibly. (Oct 2004 – Feb 2005)

Evaluated the incident and/or failure, coordinated and monitored the incident or failure investigation teams, revised reports, monitored and checked the recommendations in these reports and updated the Plant Reliability Program.

 

Plant Rehabilitation Project and Itabo Expansion.

The project consisted of rehabilitating 2 Carbon Plants (128 MW and 132 MW) back to their original settings. Rehabilitation process included: repair of the boiler, checking and implementing distributed control system, steam turbine, electrical generator, carbon handling system, water circulation system, electrical equipment, etc.

 

Planner/ Scheduler (Sep 2001 – Sep 2004)

·   Developed the project plan, critical path and baselines (using MS Project)

·   Designed project evolution curves

·   Updated the schedule on a periodic basis

·   Developed the required on-site programs and created reports

·   Integrated the subcontractor schedule with the main schedule

·   Reported to project directors informing them of project progress, possible delays, potential problems, and alternative solutions that could develop throughout the project.

 

Technical Assistance Engineer (Sep 1999 – May 2000)

 

INTERNSHIPS:

·   Internship in Operations and Maintenance of the gas turbines at the Itabo Thermal Power Plant: Dominican Electricity Corporation – (1998)

 

­­­­­­­­­­­­­­

EDUCATION

 

Mechanical and Electrical Engineering Degree (specializing in Electricity) - Universidad Autónoma de Santo Domingo – 2000 (This degree was approved in Spain as the equivalent to the official Spanish degree of an Industrial Engineering specializing in Electricity)

 

 

 

TECHNICAL SKILLS AND ADDITIONAL TRAINING:

·   Construction CPM Conference. Study and Training in the Critical Path Method of Planning & Scheduling Analysis, Orlando, Jan 2014.

·   Advanced Project Management in Primavera P6, Oracle Certified Training Course 106-P. Jul 2014

·   PHDA Management Skills Program. Thunderbird School of Business. Jun 2012

·   Assembly of Schott Tubing.

·   Team work for continuous improvement.

·   Problem analysis and decision making.

·   Project Management.

·   Advanced MS-Project.

·   Advanced Negotiation Techniques.

·   General Technical Course on Thermo solar Power Stations.

·   Course on Occupational Risk Prevention in the HTF System of Thermo solar Power Plants.

·   Steam Turbines in Thermo solar Power Plants.

·   Microsoft Excel, Microsoft Word

·   ISO 9001:2000 Quality Certification.

·   Investigation into Incidents [Root Cause Analysis] El Paso Energy, Itabo.

·   Primavera Project Planner (P3). Systec, (Mexico)

·   Business Project Management.

 

LANGUAGES

·   Spanish (Native language)

·   English (Fluent – read, write, and speak)

 

 

PROFESIONAL REFERENCES

·   Emilio Orozco

Deputy Director of US and Canada Region- Abeinsa EPC

Phone: +1 636 519 2622 (84122)  / Email: emilio.orozco@abeinsaepc.abengoa.com

 

·   Pedro Cabanillas

Project Development Director USA, Canada & Australia - Abeinsa Development
Phone: +1 314 691 8947 / Email: Pedro.cabanillas@abeinsabd.abengoa.com

 

·   Rick Laurentius

Commissioning Director - Abeinsa  EPC
Cell: +13144093567  / Email: rick.Laurentius@abeinsaepc.abengoa.com

 

·  Ramón Reina Torres

Operations Director - Schneider Electric USA/Mexico
Phone: +1 970 223 1888 ext. ext. 135 / Email:  ramon.reina@telvent.com

 

·   Craig Blair
Scheduling Supervisor / Project Controls - Linde Process Plants, Inc.
Phone: +1.918.477.1404
Email: craig.blair@LPPUSA.com

 

·   Juan Manuel Varo
Senior Mechanical and Process Engineer - Abengoa Solar.
Cell: +1 303 895 4279

Email: juanmanuel.varo@solar.abengoa.com

 



Experience

BACK TO TOP

 

Job Title

Company

Experience

Planner / Scheduler

Abengoa

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

5+ to 7 Years

Date of Availability:

Immediately

Work Status:

Dominican Republic - I require sponsorship to work in this country.
US - I require sponsorship to work in this country.

 

 

Target Job:

Target Job Title:

Planner / Scheduler

Desired Job Type:

Employee

Desired Status:

Full-Time

 

Target Company:

Company Size:

Occupation:

Engineering

·         Industrial/Manufacturing Engineering

Project/Program Management

·         General/Other: Project/Program Management

·         Program Management

 

Target Locations:

Selected Locations:

Dominican Republic
US-CA-San Diego

Relocate:

Yes

Willingness to travel:

Up to 25% travel

 

Languages:

Languages

Proficiency Level

English

Advanced

Spanish

Fluent